Uncategorized

Space Force Ups Launch Deal By $1.8B 

A ULA Atlas V rocket carries the USSF-51 mission to orbit during the vehicle’s 100th and final national security mission. Image: ULA

The US Space Force added $1.8B to its all-important deals with SpaceX and United Launch Alliance in July. The cash covers an additional 15 missions ordered before the Sept. 30 fiscal year deadline, Space Systems Command tells Payload.

The plus-up to the National Security Space Launch Phase 2 contract awarded in 2020 is a reminder of the military’s fast-growing demand for space access—and who is providing it.

  • ULA was awarded $1.1B, for a total of $4.5B for 26 missions
  • SpaceX was awarded $660M, for a total of $4B for 22 missions.

You got ratio’d: The original NSSL contract awarded 60% of launches to ULA, the Boeing/Lockheed Martin joint venture, with the other 40% headed SpaceX’s way. 

At the time, Elon Musk cried foul, telling this reporter “[b]ecause their rockets are not reusable, it will become obvious over time that ULA is a complete waste of taxpayer money.”

Now, minor vindication: Thanks to the distribution of the additional launches last year, SpaceX wound up with 46% of the currently assigned missions, compared to 54% for ULA. Delays in bringing ULA’s next-generation Vulcan rocket online cost it two missions, and there’s one NRO launch to be assigned imminently, according to SSC.

Vulcanology: ULA’s first launch under this contract, USSF-51, took off yesterday. It was also the 100th and  last national security payload aboard its workhorse Atlas V rocket.

That vehicle is being retired due to its dwindling stockpile of Russian-made RD-180 engines. The remaining vehicles have been tapped to launch a ViaSat spacecraft, Boeing’s Starliner, and Amazon Kuiper satellites.

To replace Atlas V, ULA needs Vulcan, which is scheduled to launch two missions under the contract before the end of the year. First, ULA needs the vehicle’s second flight—scheduled for mid-September—to secure its national security launch certification. ULA is also reportedly up for sale, and we wonder if we’ll hear more about that after this flight makes it to orbit.

Phase of Blue: Blue Origin’s New Glenn rocket is also competing in the next phase of national security launch contracts. That vehicle’s long-delayed first flight is expected later this year. The debut mission will carry a pair of Mars science spacecraft built by Rocket Lab, which announced their completion last week.

Related Stories
InternationalLunarMoon

China’s is on Track to Beat the US to Extract Lunar Water

Forget boots on the Moon. China looks like it’s going to beat the US to extract water from the lunar surface.

Business

Lockheed, Northrop, and Iridium Q3 Earnings Roundup

It’s earnings season for Q3. This week, a pair of primes—Lockheed Martin ($LMT) and Northrop Grumman ($NOC)—and satcom operator Iridium ($IRDM) reported their revenues for the third quarter. We’ve got the roundup of all the space-related tidbits inside. Lockheed Martin: Lockheed’s overall earnings are up and beating projections for the year, and its space business […]

EuropeStartupsVC/PE

VC Investors Weigh the Impact of Europe’s Major Merger

Payload spoke with a handful of venture capital firms on the continent, and the overwhelming sentiment was the same: Startups are going to be just fine.

DebrisEuropePolicy

ESA Unveils Worrying Space Health Index

ESA’s Health Index for the space environment currently sits at a 4. For reference, 1 is the threshold for long term orbital sustainability.