Civil

FAA Prepares an EIS for Starship KSC Operations

Image: SpaceX

The FAA is planning an Environmental Impact Statement (EIS) to assess SpaceX’s proposed modifications for Starship operations at KSC site LC-39A.

The review is considering up to 44 Starship launches at the site each year.

Make room for Starship: SpaceX has used LC-39A since 2014 for Falcon 9 and Heavy launches. NASA already completed the less cumbersome Environmental Assessment (EA) of potential Starship operations at LC-39A in 2019, which evaluated the impact of a new Starship launch pad build-out and a 24-launch-per-year manifest. 

Post-approval, SpaceX began Starship infrastructure construction. 

However, the company’s Starship operations have changed substantially since the original EA, and the agency determined that a new, broader EIS assessment was warranted to evaluate whether the operations would negatively impact the biological or physical environment.  

What’s new?: The new Starship infrastructure requests include:

  • A water deluge system
  • Propellant storage
  • The ability to employ nine engines for its Starship second stage and 35 engines for its booster, up from the six and 33 engines that are currently used
  • A catch tower equipped with metal arms that can swing close and secure a hovering Starship vehicle in midair, enabling reusability

EIS reviews are thorough and typically take north of a year to complete. The agency is opening public scoping hearings next month. 

Back at Starbase: SpaceX aims to launch Starship on flight 4 in three to five weeks. At a recent Starship presentation, Elon Musk said it may also attempt the daunting tower catch at Starbase on flight 5. 

+ FAA learning period: The Senate passed the FAA reauthorization bill on Thursday, which extended the commercial human spaceflight learning period until Jan. 1. 

Related Stories
CivilResearch

GPS Faces Growing Competition from China’s BeiDou 

Since GPS became operational in 1993, the US has been far and away the leader in satellite navigation technology. But the landscape is rapidly changing, and international alternatives are catching up. 

CislunarCivil

NASA OIG Uncovers More Cost, Schedule Overruns for ML-2

What was originally a $383M contract to be finished by 2023 has ballooned into potentially $2.7B construction that won’t see completion until 2029.

CislunarCivilResearch

Watchdogs Find Faults with Artemis IV Vehicles in Back-to-Back Reports

Over the past two weeks, two federal watchdogs—the OIG and the GAO—released separate reports highlighting critical issues with two Artemis IV vehicles: Gateway and SLS Block 1B, the upgraded SLS variant.

CivilLaunch

SpaceX Inches Closer to Increasing Starship Launches

While SpaceX’s proposal will significantly increase in the amount of rocket traffic above Boca Chica, the FAA found the impact to the environment should be minimal.